Case Study
Slough Generator 800 kVA
Location: Slough
Purpose: Essential load back up
Supplied Set: 800kVA (Standby)
Colour: Red
Product Type: Generator
The 800kVA Generator was craned to the roof of a nine-storey building, supplying the buildings essential loads, its final resting place offers a fantastic view of Windsor castle.
This was a tricky one! The generator had to be positioned by the crane through a girder system already built at the top of the building, the generator had to be built to exact measurements to allow this to happen.
The generator was witnessed tested prior to delivery and obviously measurements were taken to ensure it would fit. During the witness test the customer was happy with the operation of the generator under load and the size was just perfect.